We were contacted by the main contractor to remove existing curtain walling atrium glazing and re-install new with an office entrance and roof to level 1, this was by no easy task as there was limited access for lifting equipment and glass to be maneuvered, with a lot of input from our health & safety department and Lifting team there was a strategy in place which brought the job to success alongside our structural engineers and installation team.
From the photos you can see how much light is brought into the atrium creating a real vocal point of the space internally.